Assign tasks to your team and trade partners, link them to the drawing or location they belong to, and track every open action from creation to sign-off. No more following up on follow-ups — Buildend keeps the ball moving automatically.

You call it out in the site meeting. Someone writes it in their notebook. It goes into a WhatsApp thread. Two weeks later it resurfaces because nobody owned it and nobody followed up.
"Fix the issue on Level 3" means something different to every trade on the job. Without a pin on the drawing, tasks get misunderstood, worked in the wrong place, or ignored entirely.
You have 30 open items. Some are on your super. Some are on a sub. Some are waiting on an owner decision. Nobody has a clear picture of what's blocking what — until a deadline slips.
Buildend gives your project team a single place to create, assign, and close out every action item — from coordination tasks and field issues to owner-requested changes — with the location context and accountability structure that construction actually requires.
Define the categories that match how your team works — coordination, field issue, owner request, safety action, RFI follow-up. Filter and report by type so your PM sees exactly what kind of work is open at any point in the project.
Pin tasks directly to a location on the drawing so the assignee knows exactly where the work is. No back-and-forth interpreting a written description — the pin says it all.
Every open task shows clearly who currently owns it. Your PM can see at a glance what's sitting with the GC team, what's waiting on a sub, and what's pending an owner decision — without sending a single status email.
Route completed tasks through a review step before they're closed. Define who needs to sign off by task type so your team isn't self-certifying work that requires superintendent or PM confirmation.
Assignees are notified the moment a task is created or updated. Automatic reminders fire as due dates approach — so you're not manually chasing your team to get things done.
Track field deficiencies as tasks from the moment they're identified. Attach photos, log notes, set a due date, and link to the drawing location — so every deficiency has a complete record from open to resolved.
See how GC teams use Buildend to replace group chats and spreadsheets with a task process that keeps every action item visible, assigned, and moving toward closed.