Drawing Markups Software

Drawing markups, connected.

Pin RFIs, submittals, and tasks to the exact spot on the sheet, from the office or the field. Everyone works off the same drawing, so nothing gets lost in a phone call or text.

Buildend
DocumentsSubmittalsDrawingsSchedules
HW
9Open Markups
22Sheets Marked Up
4Avg Days to Resolve
MarkupPriorityStatusUpdated
A-501 · Wall SectionsHighUnresolvedFeb 7
S-201 · Foundation PlanMediumIn ReviewJan 30
M-301 · HVAC LayoutLowResolvedJan 20
Markup Log

See exactly which markups are still open.

Every markup and the item it's linked to, tracked by sheet, owner, and status. See what's waiting on whom without calling around.

Buildend
Project HomeDocumentsLogsSchedules
HW
Drawing Markups+ New Markup
9
Open Markups
22
Sheets Marked Up
14
Resolved This Month
4
Avg Days to Resolve
MarkupSheetAuthorStatusTypeUpdated
MK-041Wall SectionsSuperintendentHighUnresolvedField ConflictFeb 7
MK-038Foundation PlanProject EngineerMediumIn ReviewClarificationJan 30
MK-033HVAC LayoutMEP CoordinatorLowResolvedCoordinationJan 20
MK-029Power Plan – Level 1ElectricianLowResolvedField ConflictJan 12

Illustrative sample data shown for layout purposes.

Connected Workflow

A markup usually means something else needs to move.

When a markup is linked to an RFI, submittal, or task, the drawing goes with it. The answer comes back to the same spot on the sheet, so the field builds what the office approved.

Drawing
→
Markup
→
RFI, Submittal, or Task
→
Resolved
What's Included

Everything a markup tool needs, in one place.

Redline directly on the sheet

Draw, annotate, and comment straight on the current drawing — in the browser or from a tablet.

Status tracking

Every markup moves from Open to In Review to Resolved, with an owner at each stage.

Photo attachments

Attach field photos directly to a markup so the context isn't lost.

Linked RFIs, submittals & tasks

Link a markup to an RFI, submittal, task, or change order without re-explaining the issue.

Full markup history

Every redline stays attached to the sheet and the revision it was made on.

Mobile access

Mark up drawings from the field on a phone or tablet — no printed set required.

AI-Assisted

Ask Buildend which RFIs or markups on a sheet are still open, and get the list in seconds.

Why It Matters

Fewer lost redlines.

Nothing stays on a paper set

Markups live on the digital sheet, not a print that never makes it back to the office.

Know what's still open

Unresolved markups are visible to the whole team, not just the person who drew them.

Straight into an RFI

A markup that needs an answer becomes an RFI in one step, with the drawing attached.

“

Moving from emails and phone calls to Buildend has made our projects far more organized and helped our team stay aligned on what's happening in the field.

Hamid W. — Owner, Evercrete Construction

Trusted by teams across construction

Evercrete FormingWerkLivCentronIWCDGallivan DevelopmentsSouthern Builders of Florida

See how Buildend handles Markups.

Request a demo and see how Buildend keeps field markups connected to the drawing set.

Request a Demo