Estimating Software

Estimates that become the budget.

Price drawing quantities with your own unit costs, then turn the approved estimate into the project budget without entering it again.

Buildend
PreconstructionSubmittalsDrawingsSchedules
HW
13 - Estimate
Save ChangesExport
Prepared ForSample Owner
Prepared BySample Estimator
ModifiedSep 15, 2026
Worksheet
Line ItemQtyUnit CostMaterialTotal
1  Concrete$12,795.90
1.1  ConcreteMaterial658.66 cf$15.00$9,879.90$9,879.90
1.2  Potholing & TestingEquipment1.00 ls$2,500.00$0.00$2,500.00
1.3  Outlet AssemblyEquipment1.00 ls$416.00$0.00$416.00
Subtotal$9,879.90$12,795.90
Estimate Workspace

See exactly where each estimate stands.

Price every line from a shared unit-cost library, so the number doesn't depend on who built the spreadsheet.

Buildend
Project HomeDocumentsLogsSchedules
HW
Price List
01-00-00 · General Requirements
02-00-00 · Existing Conditions
03-00-00 · Concrete
04-00-00 · Masonry
05-00-00 · Metals
06-00-00 · Wood & Plastics
01-00-00 · General Requirements (2)
+ Add Item
AllM · MaterialL · LaborE · Equipment
DescriptionUnit Price
CarpentersAssemblyCode: 01-00-00 · General Requirements
$75.00/hr
LabourerLCode: 01-00-00 · General Requirements
$56.00/hr

Illustrative estimate worksheet and cost catalog views with sample project data, shown for layout purposes.

Connected Workflow

An estimate is the starting point, not the finish line.

A winning estimate should become the project budget without re-entering a single line item. Buildend carries the number forward.

Takeoff
→
Estimate
→
Approval
→
Budget
What's Included

Built on your own cost data.

Built from your takeoffs

Pull measured quantities straight from your takeoffs into estimate line items.

Unit-cost library

Keep company unit costs built from your own project history, and update labor and material prices as the market moves.

Markup & contingency control

Apply markup and contingency by cost code, and see the effect on the total instantly.

Subcontractor bid comparison

Compare incoming trade bids against your estimate, side by side, by scope.

Converts straight to budget

Turn the approved estimate into the project budget with the same cost structure, without re-entering a line.

Structured estimates

Keep quantities, unit costs, and totals in one cost structure, so reviewers can see how the number was built.

AI-Assisted

Ask Buildend how this estimate compares to similar past projects, cost code by cost code.

Why It Matters

Fewer estimating blind spots.

Estimate from real data

Your own historical costs inform every new estimate, not a guess.

Price work consistently

Everyone prices from the same library, not their own spreadsheet and assumptions.

Win the job, keep the number

The project starts from the approved estimate, so the budget doesn't drift from the number that won the job.

“

Moving from emails and phone calls to Buildend has made our projects far more organized and helped our team stay aligned on what's happening in the field.

Hamid W. — Owner, Evercrete Construction

Trusted by teams across construction

Evercrete FormingWerkLivCentronIWCDGallivan DevelopmentsSouthern Builders of Florida

Build the estimate once. Start the project with the same number.

See how Buildend carries an approved estimate straight into the project budget.

Request a Demo