Free tools · 6 calculators

Construction calculators built for the field.

Concrete volume, labor cost, markup, change order impact, retainage and RFI delays. Quick, accurate numbers in the browser, with every input shown next to the answer.

  • Runs in your browser
  • Results update as you type
  • Free to use · no sign-up
Like doing this by hand?

Run these numbers on live project data.

Buildend ties takeoffs, labor, change orders, retainage and RFIs to your budget, so the math updates when the job does.

Request a demo →
30 minutes, using your cost codes.
Before you rely on it

Estimates only. Confirm quantities, wage rates and contract terms with your suppliers, payroll and contract documents before you bid, order or bill.

Disclaimer

The calculators, assessments, and checklists on this page are provided by Buildend for general informational and planning purposes only. They are not a substitute for professional advice from a licensed engineer, accountant, attorney, or other qualified professional, and they should not be relied upon as the sole basis for any financial, structural, contractual, or safety-related decision.

Results are estimates based on the values you enter and standard industry formulas or assumptions. They do not account for site-specific conditions, local building codes, contract terms, material specifications, or other factors that may materially affect actual outcomes. Buildend makes no warranty, express or implied, as to the accuracy, completeness, or applicability of any result produced by these tools.

You are solely responsible for verifying all calculations, quantities, and figures with appropriate professionals — including your ready-mix supplier, structural engineer, accountant, and legal counsel — before relying on them for bidding, ordering materials, structural design, or contractual purposes.

To the fullest extent permitted by law, Buildend disclaims all liability for any loss, damage, or claim arising from the use of, or reliance on, these tools.