Buildend
Products
Project Execution
RFIsSubmittalsSchedulesTasksMeeting Minutes
Financial Management
BudgetsCommitmentsChange OrdersInvoices
Preconstruction
TakeoffsEstimatesBid Management
Collaboration & Documents
DrawingsSpecsMarkups
Field Operations
CertificatesQuality & Safety FormsTime Tracking
See the full platform
IntegrationsResourcesPricing
Log InRequest a Demo
Products ⌄
Project Execution
RFIsSubmittalsSchedulesTasksMeeting Minutes
Financial Management
BudgetsCommitmentsChange OrdersInvoices
Preconstruction
TakeoffsEstimatesBid Management
Collaboration & Documents
DrawingsSpecsMarkups
Field Operations
CertificatesQuality & Safety FormsTime Tracking
SolutionsIntegrationsResourcesPricing
Log InRequest a Demo
← Back to Construction Calculators

Concrete Calculator

Free tool

Concrete calculator

Estimate concrete volume, ready-mix cost, and bag count for slabs, footings, columns, and stairs.

ft
in
ft
in
in
slabs
ft
in
in
in
footings
in
ft
in
columns
steps
ft
in
in
in
ft
in

$

Enter dimensions greater than 0 to calculate.

Volume (cubic feet)

70.0 ft³

Volume (cubic yards)

2.59 yd³

Bags needed

156

60 lb premix bags

Estimated ready-mix cost

$454

Ready-mix delivery, at $175/yd³

See how Buildend tracks material takeoffs to budget →

Estimate only. Actual concrete needs vary with subgrade prep, forming tolerances, and mix design. Confirm quantities with your ready-mix supplier before ordering.

Disclaimer: The calculators, assessments, and checklists on this page are provided by Buildend for general informational and planning purposes only. They are not a substitute for professional advice from a licensed engineer, accountant, attorney, or other qualified professional, and they should not be relied upon as the sole basis for any financial, structural, contractual, or safety-related decision. Results are estimates based on the values you enter and standard industry formulas or assumptions. They do not account for site-specific conditions, local building codes, contract terms, material specifications, or other factors that may materially affect actual outcomes. Buildend makes no warranty, express or implied, as to the accuracy, completeness, or applicability of any result produced by these tools. You are solely responsible for verifying all calculations, quantities, and figures with appropriate professionals — including your ready-mix supplier, structural engineer, accountant, and legal counsel — before relying on them for bidding, ordering materials, structural design, or contractual purposes. To the fullest extent permitted by law, Buildend disclaims all liability for any loss, damage, or claim arising from the use of, or reliance on, these tools.

Buildend

Construction management software for general contractors — connected from preconstruction through closeout.

Company

AboutCareersPlatformRequest a DemoContact

Support & Legal

Support GuidesTerms & ConditionsPrivacy PolicyLegal Documents

Resources

BlogRFI TemplatePayment Application TemplateConstruction CalculatorsBuildend vs ProcoreBuildend vs FieldwireBuildend vs Autodesk

© 2026 Buildend Inc. All rights reserved.

LinkedInApp StoreGoogle PlayX

1. Federal Reserve Bank of Richmond, “Five Decades of Decline: U.S. Construction Sector Productivity,” Economic Brief No. 25-31 (Aug 2025). richmondfed.org