Takeoff Software

Takeoffs, straight to the estimate.

Measure area, length, and count on screen, right on the latest drawing. No printed sets, no retyped numbers.

Buildend
Preconstruction Submittals Drawings Schedules
HW
A-501 - Interior Finish & Millwork Plan ▾
100%
concrete +
Concrete Type: Volume Output: 799.21 cf
Walnut Cabinet Line Type: Linear Output: 7.70 ft
shaker doors Type: Count · Shape: ○ Output: 3 ea
Hardware Type: Count · Shape: △ Output: 3 ea
Interior finish and millwork plan 799.21 cf 7.70 ft 3 3
Takeoff Workspace

See exactly what's measured, and where it feeds.

Quantities measured off the current drawing set, tagged by cost code, and ready to flow into the estimate.

Buildend
Project HomeDocumentsLogsSchedules
HW
Takeoff Summary
Send to Estimate
C01 · Bus Loop and Sidewalk Rehabilitation
ItemCost CodeTypeQuantity
Concrete03-00-00 · ConcreteVolume799.21 cf
Walnut Cabinet LineRevised06 41 00 · Architectural CaseworkLinear7.70 ft
shaker doors06 41 00 · Architectural CaseworkCount3 ea
HardwareRevised06-01-20 · WoodworkCount3 ea
2 items flagged for revision since drawing C01 was last updated.

Illustrative takeoff drawing and quantity summary views with sample project data, shown for layout purposes.

Connected Workflow

A takeoff shouldn't be measured twice.

A quantity you measure once should carry into the estimate, and the estimate into the budget. Buildend connects the numbers instead of re-keying them.

Drawing
→
Takeoff
→
Estimate
→
Budget
What's Included

Everything a takeoff needs, in one place.

On-screen digital measurement

Measure area, length, and count directly on the latest drawing set — no printing required.

Cost code tagging

Tag every quantity with the cost code it feeds, so nothing gets lost translating to the estimate.

Revision tracking

Know instantly which takeoffs are based on an outdated drawing revision.

Flows into the estimate

Push measured quantities straight into your estimate line items, no re-entry.

Full takeoff history

Every measurement and revision stays on the record — back up your numbers if they're questioned.

Mobile access

Review takeoffs and drawings from a phone or tablet, in the field or the trailer.

AI-Assisted

Ask Buildend what changed in your takeoff since the last revision.

Why It Matters

Fewer estimating errors, fewer re-measures.

Always the current drawing

Takeoffs flag automatically when the underlying drawing gets revised.

No re-keying quantities

Measured quantities carry straight into the estimate — one number, not two.

Back up your numbers

Every takeoff is on the record if a quantity is ever questioned.

“

Moving from emails and phone calls to Buildend has made our projects far more organized and helped our team stay aligned on what's happening in the field.

Hamid W. — Owner, Evercrete Construction

Trusted by teams across construction

Evercrete FormingWerkLivCentronIWCDGallivan DevelopmentsSouthern Builders of Florida

See how Buildend handles Takeoffs.

Request a demo and see how Buildend connects takeoffs straight through to your estimate.

Request a Demo